Visit Our Sponsors |
The company is now operating a 60,000-square meter, multi-user complex at Hazelmere, and a 40,000-square meter facility for integrated transport and vehicle storage services at High Wycombe. Hazelmere features approximately 4,600 racking locations and continuous loading docks with dock levelers. High Wycombe was designed to process around 25,000 vehicles per year. CEVA constructed the new buildings near the Perth Airport freight hub and key arterial roads, with proximity to major infrastructure, along with air and ocean-service connections. According to CEVA, the new sites are serving customers in the automotive, energy and mining, and consumer and retail sectors.
RELATED CONTENT
RELATED VIDEOS
Timely, incisive articles delivered directly to your inbox.